Boring
Yes, this mabel dress is boring. I’ve go six inches done. As I said, there are basically 20 inches of boring stuff, so I have only 14 inches left! After that I get to do the part above the gathered skirt part. More concerning, I have now finished 1/5 of the yarn. Will I have enough? It’ll take 3 full balls plus more to finish the bottom half. The top part won’t take as much. It might work out. We’ll find out in a few weeks.
I also bought yarn for a seond short sleeved ribbon sweater, in baby ull. That only takes a week, so I might just do half the dress, then switch to the sweater for awhile. Also I got some cute cotton patterns for cute tops for little girls. Size 1, 2, 3 are available. Hmmm. Also there’s a cotton hat I want to make at some point but I don’t even have the pattern yet. I should look back at my list and see what else I should be making. Also, Christmas is only 5 months away!
